目錄
一、 工程概況········································1
1、 電纜設(shè)計(jì)情況····································1
2、 直埋電纜施工現(xiàn)場(chǎng)情況····························3
二、 施工關(guān)鍵工序與作業(yè)方法··························3
1、 路徑復(fù)測(cè)和放樣··································3
2、 直埋電纜溝開挖··································3
3、 行車道的開挖····································3
4、 電纜的敷設(shè)······································4
三、 施工質(zhì)量要求和工藝要點(diǎn)··························4
四、 安全技術(shù)要求····································6
五、 組織措施········································8