1.1按施工預(yù)算書編制單位工程材料計(jì)劃;
1.2按項(xiàng)目經(jīng)理部提出暫設(shè)、備料計(jì)劃編制暫設(shè)、備料計(jì)劃;
1.3按設(shè)計(jì)變更單、設(shè)計(jì)聯(lián)絡(luò)單、現(xiàn)場(chǎng)經(jīng)濟(jì)簽證及時(shí)增、減材料計(jì)劃;
1.4按要求上報(bào)各種統(tǒng)計(jì)報(bào)表;
1.5報(bào)表印章齊全、手續(xù)合理、親自報(bào)送;
1.6搞好材料資金動(dòng)態(tài)月份統(tǒng)計(jì),與財(cái)務(wù)帳目相符;
1.7搞好單位工程安全材料月份統(tǒng)計(jì),通報(bào)及時(shí);
1.8對(duì)庫(kù)存安全物資全面稽核,每月抽查;